مقدمة

This manual provides essential information for the safe and efficient operation, installation, and maintenance of the GoodWe 3648-EM Hybrid Inverter. Please read this manual thoroughly before installation and operation, and keep it for future reference.

The GoodWe 3648-EM is a high-performance hybrid inverter designed for residential and light commercial solar energy systems, integrating solar power generation, battery storage, and grid connection capabilities.

المنتج انتهىview

The GoodWe 3648-EM Hybrid Inverter system includes the main inverter unit and a three-phase Smart Meter for comprehensive energy management.

GoodWe 3648-EM Hybrid Inverter and Smart Meter

Figure 1: GoodWe 3648-EM Hybrid Inverter (top) and accompanying Smart Meter (bottom left).

This image displays the primary components of the GoodWe 3648-EM system. The larger unit is the hybrid inverter, characterized by its white casing and black control panel with indicator lights. Below and to the left is the compact Smart Meter, designed for DIN rail mounting, also in a white casing with a small display and indicator lights.

أمام view of GoodWe 3648-EM Hybrid Inverter

الشكل 2: الجبهة view of the GoodWe 3648-EM Hybrid Inverter.

This image shows a detailed front view of the GoodWe 3648-EM Hybrid Inverter. The front panel features a series of LED indicators and buttons for status monitoring and basic control. The GoodWe logo is visible on the right side of the control panel.

GoodWe Smart Meter close-up

الشكل 3: الصورة عن قرب view of the GoodWe Smart Meter.

This image provides a close-up of the GoodWe Smart Meter, a compact device with a small digital display and several indicator lights (power, communication, status). It is designed for integration into electrical panels to monitor energy flow.

المواصفات الفنية

Table 1: GoodWe 3648-EM Hybrid Inverter Specifications
ميزةمواصفة
نموذجGW3648- إم
القدرة المقدرة3.68 كيلو فولت أمبير
Backup Power (Single-phase)5.0 كيلو واط
MPP Trackers2
MPPT المجلدtage المدى280-500 V DC
ماكس. التيار الشاحن50 أ دس
تواصلWi-Fi, Integrated Web الخادم
عداد ذكيThree-phase included
الأبعاد (العرض × الارتفاع × العمق)347 × 432 × 175 ملم
فئة الحمايةIP65
وزن17 كجم

تعليمات السلامة

Always adhere to local electrical codes and regulations. Installation and maintenance should only be performed by qualified personnel.

التثبيت والإعداد

1. التفريغ والتفتيش

Carefully unpack the inverter and Smart Meter. Inspect all components for any signs of damage during transit. Report any damage to your supplier immediately.

2. تركيب العاكس

Choose a suitable mounting location that is:

Use the provided mounting bracket and hardware to securely fasten the inverter to a solid wall or frame.

3. التوصيلات الكهربائية

All electrical connections must comply with local wiring regulations and standards. Refer to the connection diagram below for guidance.

مؤخرة view of GoodWe 3648-EM Hybrid Inverter with connection ports

الشكل 4: خلفي view of the GoodWe 3648-EM Hybrid Inverter showing connection ports.

This image displays the rear panel of the GoodWe 3648-EM Hybrid Inverter, highlighting its various connection terminals. These include inputs for PV strings (PV1, PV2), battery connections, grid connection (ON-GRID), backup load connection (BACK-UP), and communication ports (RS485, Meter). A large heat sink is visible at the bottom.

  1. اتصال الكهروضوئية: Connect the positive and negative cables from your solar array to the PV1 and PV2 inputs. Ensure correct polarity.
  2. توصيل البطارية: Connect the battery bank to the dedicated battery terminals. Observe correct polarity (+/-).
  3. اتصال الشبكة: Connect the inverter to the main electrical grid.
  4. Backup Load Connection: For critical loads, connect them to the backup output.
  5. Smart Meter Connection: Connect the three-phase Smart Meter as per the wiring diagram provided in the full installation guide.
  6. التأريض: تأكد من تأريض هيكل العاكس بشكل صحيح.

4. Communication Setup (Wi-Fi)

The inverter features integrated Wi-Fi for monitoring and configuration. Follow these general steps:

تشغيل العاكس

1. التشغيل الأولي

After all connections are secure and verified:

  1. Turn on the DC isolator switch for the PV array.
  2. قم بتشغيل قاطع الدائرة الكهربائية الخاص بالبطارية.
  3. Turn on the AC breaker from the grid.
  4. The inverter will perform a self-test and then begin operation. Observe the LED indicators on the front panel for status.

2. المراقبة

Monitor the inverter's performance via the integrated web server or the GoodWe monitoring app/platform. Key parameters to observe include:

3. إجراء إيقاف التشغيل

To safely shut down the inverter:

  1. Turn off the AC breaker from the grid.
  2. قم بإيقاف تشغيل قاطع البطارية.
  3. Turn off the DC isolator switch for the PV array.
  4. Wait for all indicators on the inverter to turn off.

صيانة

تضمن الصيانة المنتظمة الأداء الأمثل وطول عمر العاكس الخاص بك.

استكشاف الأخطاء وإصلاحها

This section provides basic troubleshooting steps for common issues. For complex problems, contact GoodWe technical support or a certified installer.

الجدول 2: دليل استكشاف الأخطاء وإصلاحها الشائع
مشكلةالسبب المحتملحل
لا يعمل العاكسNo DC input from PV or battery; AC grid disconnected; Emergency stop activated.Check all breakers and isolators (PV, battery, AC grid). Ensure emergency stop button is disengaged.
انخفاض انتاج الطاقةShading on PV panels; Dirty PV panels; Inverter derating due to high temperature.Check for shading. Clean PV panels. Ensure adequate ventilation around the inverter.
خطأ في الاتصالWi-Fi signal weak; Incorrect network settings; Router issue.Check Wi-Fi signal strength. Reconfigure network settings. Restart router.
تم عرض رمز الخطأInternal fault; Grid fault; PV overvoltagه / سفولtage.Note the error code and consult the full user manual or contact GoodWe support. Do not attempt repairs yourself.

الضمان والدعم

GoodWe products typically come with a standard warranty. Please refer to your purchase documentation or the official GoodWe website for specific warranty terms and conditions applicable to your region and model.

For technical support, warranty claims, or further assistance, please contact your installer or the official GoodWe support channels:

المستندات ذات الصلة - 3648-EM / 0131662

قبلview دليل مستخدم العاكس الهجين من سلسلة GoodWe EM
يقدم دليل المستخدم هذا معلومات مفصلة عن عاكسات الطاقة الهجينة من سلسلة GoodWe EM، بما في ذلك الطرازات GW3048D-EM وGW3648D-EM وGW5048D-EM. ويغطي جوانب أساسية مثل التركيب والتشغيل واحتياطات السلامة واستكشاف الأخطاء وإصلاحها والمواصفات الفنية لتحسين استخدام الطاقة الشمسية وتخزين البطاريات والتفاعل مع الشبكة.
قبلview دليل التركيب السريع لمحول الطاقة الهجين من سلسلة GoodWe EM
يوفر دليل التثبيت السريع هذا تعليمات أساسية لجهاز العاكس الهجين من سلسلة GoodWe EM، بما في ذلك السلامة والتوصيلات الكهربائية والتشغيل للطرازات GW5048-EM و GW3648-EM و GW3048-EM.
قبلview دليل مستخدم العاكس الهجين من سلسلة GOODWE ET
دليل المستخدم الشامل لمحولات الطاقة الهجينة من سلسلة GOODWE ET، يغطي التركيب والتشغيل والسلامة واستكشاف الأخطاء وإصلاحها والمواصفات الفنية للطرز مثل GW5KL-ET، وGW6KL-ET، وGW8KL-ET، وGW10KL-ET.
قبلview Problem PE-N Relay in GoodWe HV Hybrid Inverter: Analysis and Troubleshooting
Detailed analysis of PE-N relay issues in GoodWe HV Hybrid Inverters (ET 29.9) during grid loss and reconnection, including measurement setup, sequence diagrams, and oscilloscope data.
قبلview ضمان محدود لنظام العاكس من GOODWE - سوق البرازيل
شروط وأحكام الضمان التفصيلية لأنظمة العاكس GOODWE المباعة في السوق البرازيلية، والتي تغطي التغطية والاستثناءات وعملية المطالبات وحدود المسؤولية.
قبلview دليل مستخدم تطبيق GoodWe SolarGo
يقدم دليل المستخدم هذا تعليمات مفصلة لاستخدام تطبيق GoodWe SolarGo لمراقبة وإدارة عاكسات الطاقة الشمسية GoodWe. يغطي الدليل تثبيت التطبيق، وتوصيله، وضبط المعلمات، وصيانة الجهاز، واستكشاف الأخطاء وإصلاحها لطرازات مثل DNS، وSDT G2، وMT G2، وSMT، وHT.