This manual provides essential information for the safe and efficient operation, installation, and maintenance of the GoodWe 3648-EM Hybrid Inverter. Please read this manual thoroughly before installation and operation, and keep it for future reference.
The GoodWe 3648-EM is a high-performance hybrid inverter designed for residential and light commercial solar energy systems, integrating solar power generation, battery storage, and grid connection capabilities.
المنتج انتهىview
The GoodWe 3648-EM Hybrid Inverter system includes the main inverter unit and a three-phase Smart Meter for comprehensive energy management.

Figure 1: GoodWe 3648-EM Hybrid Inverter (top) and accompanying Smart Meter (bottom left).
This image displays the primary components of the GoodWe 3648-EM system. The larger unit is the hybrid inverter, characterized by its white casing and black control panel with indicator lights. Below and to the left is the compact Smart Meter, designed for DIN rail mounting, also in a white casing with a small display and indicator lights.

الشكل 2: الجبهة view of the GoodWe 3648-EM Hybrid Inverter.
This image shows a detailed front view of the GoodWe 3648-EM Hybrid Inverter. The front panel features a series of LED indicators and buttons for status monitoring and basic control. The GoodWe logo is visible on the right side of the control panel.

الشكل 3: الصورة عن قرب view of the GoodWe Smart Meter.
This image provides a close-up of the GoodWe Smart Meter, a compact device with a small digital display and several indicator lights (power, communication, status). It is designed for integration into electrical panels to monitor energy flow.
المواصفات الفنية
| ميزة | مواصفة |
|---|---|
| نموذج | GW3648- إم |
| القدرة المقدرة | 3.68 كيلو فولت أمبير |
| Backup Power (Single-phase) | 5.0 كيلو واط |
| MPP Trackers | 2 |
| MPPT المجلدtage المدى | 280-500 V DC |
| ماكس. التيار الشاحن | 50 أ دس |
| تواصل | Wi-Fi, Integrated Web الخادم |
| عداد ذكي | Three-phase included |
| الأبعاد (العرض × الارتفاع × العمق) | 347 × 432 × 175 ملم |
| فئة الحماية | IP65 |
| وزن | 17 كجم |
تعليمات السلامة
Always adhere to local electrical codes and regulations. Installation and maintenance should only be performed by qualified personnel.
- Ensure the inverter is disconnected from all power sources (PV, battery, grid) before performing any work.
- لا تفتح العاكس جasing unless explicitly instructed by GoodWe technical support.
- تجنب لمس المكونات الكهربائية الحية.
- تأكد من التأريض الصحيح للعاكس.
- أبقِ الأطفال والموظفين غير المصرح لهم بعيدًا عن منطقة التثبيت.
التثبيت والإعداد
1. التفريغ والتفتيش
Carefully unpack the inverter and Smart Meter. Inspect all components for any signs of damage during transit. Report any damage to your supplier immediately.
2. تركيب العاكس
Choose a suitable mounting location that is:
- Well-ventilated and protected from direct sunlight.
- يُحفظ بعيداً عن المواد القابلة للاشتعال.
- يمكن الوصول إليها للصيانة.
- Capable of supporting the inverter's weight (17 kg).
Use the provided mounting bracket and hardware to securely fasten the inverter to a solid wall or frame.
3. التوصيلات الكهربائية
All electrical connections must comply with local wiring regulations and standards. Refer to the connection diagram below for guidance.

الشكل 4: خلفي view of the GoodWe 3648-EM Hybrid Inverter showing connection ports.
This image displays the rear panel of the GoodWe 3648-EM Hybrid Inverter, highlighting its various connection terminals. These include inputs for PV strings (PV1, PV2), battery connections, grid connection (ON-GRID), backup load connection (BACK-UP), and communication ports (RS485, Meter). A large heat sink is visible at the bottom.
- اتصال الكهروضوئية: Connect the positive and negative cables from your solar array to the PV1 and PV2 inputs. Ensure correct polarity.
- توصيل البطارية: Connect the battery bank to the dedicated battery terminals. Observe correct polarity (+/-).
- اتصال الشبكة: Connect the inverter to the main electrical grid.
- Backup Load Connection: For critical loads, connect them to the backup output.
- Smart Meter Connection: Connect the three-phase Smart Meter as per the wiring diagram provided in the full installation guide.
- التأريض: تأكد من تأريض هيكل العاكس بشكل صحيح.
4. Communication Setup (Wi-Fi)
The inverter features integrated Wi-Fi for monitoring and configuration. Follow these general steps:
- السلطة على العاكس.
- Connect your device (smartphone, laptop) to the inverter's Wi-Fi hotspot (SSID typically starts with "GoodWe_").
- Access the inverter's web interface via a browser (default IP address usually 192.168.1.1).
- Configure network settings to connect the inverter to your home Wi-Fi network.
- Register the inverter on the GoodWe monitoring platform (e.g., SEMS Portal) for remote monitoring.
تشغيل العاكس
1. التشغيل الأولي
After all connections are secure and verified:
- Turn on the DC isolator switch for the PV array.
- قم بتشغيل قاطع الدائرة الكهربائية الخاص بالبطارية.
- Turn on the AC breaker from the grid.
- The inverter will perform a self-test and then begin operation. Observe the LED indicators on the front panel for status.
2. المراقبة
Monitor the inverter's performance via the integrated web server or the GoodWe monitoring app/platform. Key parameters to observe include:
- توليد الطاقة الكهروضوئية
- Battery charge/discharge status
- Grid interaction (export/import)
- استهلاك الحمل
- حالة النظام ورموز الأخطاء
3. إجراء إيقاف التشغيل
To safely shut down the inverter:
- Turn off the AC breaker from the grid.
- قم بإيقاف تشغيل قاطع البطارية.
- Turn off the DC isolator switch for the PV array.
- Wait for all indicators on the inverter to turn off.
صيانة
تضمن الصيانة المنتظمة الأداء الأمثل وطول عمر العاكس الخاص بك.
- شهريا: Visually inspect the inverter and wiring for any signs of damage, corrosion, or loose connections. Ensure ventilation openings are clear of dust and debris.
- سنويا: Have a qualified technician perform a thorough inspection, including checking electrical connections, torque settings, and system performance. Clean the inverter's heat sink if necessary.
- Keep the area around the inverter clean and free from obstructions.
استكشاف الأخطاء وإصلاحها
This section provides basic troubleshooting steps for common issues. For complex problems, contact GoodWe technical support or a certified installer.
| مشكلة | السبب المحتمل | حل |
|---|---|---|
| لا يعمل العاكس | No DC input from PV or battery; AC grid disconnected; Emergency stop activated. | Check all breakers and isolators (PV, battery, AC grid). Ensure emergency stop button is disengaged. |
| انخفاض انتاج الطاقة | Shading on PV panels; Dirty PV panels; Inverter derating due to high temperature. | Check for shading. Clean PV panels. Ensure adequate ventilation around the inverter. |
| خطأ في الاتصال | Wi-Fi signal weak; Incorrect network settings; Router issue. | Check Wi-Fi signal strength. Reconfigure network settings. Restart router. |
| تم عرض رمز الخطأ | Internal fault; Grid fault; PV overvoltagه / سفولtage. | Note the error code and consult the full user manual or contact GoodWe support. Do not attempt repairs yourself. |
الضمان والدعم
GoodWe products typically come with a standard warranty. Please refer to your purchase documentation or the official GoodWe website for specific warranty terms and conditions applicable to your region and model.
For technical support, warranty claims, or further assistance, please contact your installer or the official GoodWe support channels:
- جودوي الرسمية Webموقع: www.goodwe.com
- SEMS Portal (Monitoring): www.semsportal.com